Spec it. Schedule it. Ship it to the jobsite.
Jump straight to the showers and bases contractors order most, get lead times and freight details, and talk to a real person who double-checks your order before production starts.
At a glance
Quick links to popular categories
The categories contractors come back to most. Pick one and filter by size, drain side and brand.
Need a spec sheet, install guide or rough-in dimensions? Ask Abby or call 877-392-2531 and we’ll send them to your phone or email.
How a job runs with us
Confirm specs
Call us or ask Abby. We go over size, drain side and threshold before anything is built.
Place the order
Work back from your install date so the shower is on site before you tear out.
Built for your job
Made-Upon-Order: 5–10 business days before it ships.
Freight to the jobsite
Typically 1–5 business days. The carrier calls to set a liftgate curbside appointment.
Inspect on delivery
Note any outer damage on the bill of lading and call us the same day.
Demo & install
Tear out only once the new shower is on site and inspected.
Built to save time on the jobsite
Pre-leveled base
No mud bed or mortar. Sets directly on a flat, level subfloor, so there’s no cure time.
Factory-reinforced walls
Grab bars and fold-down seats mount to the panel. No extra wood blocking in the framing.
Fits a 30" doorway
Multi-piece panels carry through standard interior doors and tight hallways. No wall removal.
Tile-accent option
Recessed tile-receptive sections take your client’s tile, while the base and walls handle the water.
Threshold quick guide
Match the threshold height to the finished floor, then pick the edge.
Delivery day checklist
- Have two people ready to move the crate from the curb.
- A flat furniture dolly makes it easy to roll the crate to a secure, dry spot until install day.
- Inspect the crate before the driver leaves.
- Note any outer damage on the bill of lading before you sign.
- Take photos of any damage and the signed bill of lading, whether you keep or refuse the shipment.
- When in doubt, you can always refuse delivery.
- Call us the same day. We file the freight claim and get a replacement moving at no extra cost to you.
Don’t be a hero. Get the liftgate.
We know our contractors are rock stars. Save the superhero moves for the jobsite.
Our showers are built tough, and they’re heavy: a complete shower in its crate can weigh up to 350 lbs. Let the liftgate do the lifting. Your back will thank you.
You’re paid to build beautiful bathrooms, not audition for World’s Strongest Contractor.
Respect Murphy’s Law.
Before you tear out that old tub, make sure the new shower is delivered, opened and checked off.
Keeping the old one running until the new one passes inspection is the difference between a smooth job and explaining to your client why they’re showering at the gym all week.
Skip the guess. Get the specs.
We’re a quick call away before you place your order and production starts, here to double-check specs and catch anything that could slow down your job. And we’re still here after the sale.
Made-Upon-Order products are built for your job and can’t be returned, so a two-minute check is worth it.
Call 877-392-2531
Ask Abby
EZ Able®’s assistant. A real person follows up.
Not sure if it will fit your alcove, clear your doorway, or arrive on time? Chat with me for straight answers.
Prefer a person? Call 877-392-2531 to get connected to a specialist now. M–F 9–5 EST.